Adding and Removing Studies Within a Project
To Add a Study(s) to a Project
- From the File menu, choose Project Editor.
- If you haven
’t already done so, create a new project. If the project you want to work with already exists, there’s no need to create a new project.
Select the study(s) you would like to place into the target Project.
the study or studies into the target project.
The drop off point can be anywhere within the target project. This includes
the project description, or any study already located within the target project.
To Remove a Study(s) from a Project
- Select study(s) you wish to remove from a project.
- Drag the study(s) outside the project. You may drag the study(s) to either
another project, or to the study list.
See Also:
Reordering Studies and Projects